One interactive map of existing substations, indicative transmission lines, and planned future substations and lines, so EPCs and developers can pick better sites and plan interconnections with confidence.
A closer look at the main views inside the platform.





A quick tour of the map, from nearest substation to KML upload.
Stop piecing together PDF plans and spreadsheets. See where the grid is today and where it is headed.
Locations across Luzon, Visayas and Mindanao, with voltage level, capacity and operational status on hover.
Color-coded by voltage, from 115 kV up to 500 kV (69 kV coming soon), so you can see the indicative grid around your site.
Planned assets from the Transmission and Distribution Development Plans, shown with dashed lines and estimated completion dates.
Solar, wind, hydro, geothermal, coal, diesel and BESS (existing, committed and indicative) layered on the same map.
Drop in your project boundary and get its surface area, an estimated PV capacity range and the nearest substation hub.
Measure routes, find the nearest substation and line, and run radial searches around your project location.
Drop a KML/KMZ boundary or click a location on the map.
Find the nearest substations and lines, with voltage and distance.
Overlay planned TDP substations, lines and upgrades around your site.
Shortlist sites and scope interconnection before spending on studies.
Understand the current grid network early, when site and interconnection decisions matter most.
Both plans include full access to every layer and tool. Cancel anytime.
Prices are in US dollars; applicable taxes are added at checkout. By subscribing you agree to our Terms of Service and Refund Policy. You can request a full refund within 14 days of your first payment.
The map is based on the Transmission Development Plan, the Distribution Development Plans and DOE data. Existing substation locations are exact, future substation locations are approximate, and transmission line routes are indicative only, drawn to represent the interconnection. Line routes should not be used as the basis for proximity or distance. Always confirm with the grid operator before final decisions.
No. This is an independent platform and is not an official publication of any government agency or grid operator.
KML and KMZ. Upload your project boundary to get its surface area, an estimated PV capacity range and the nearest substation hub.
Use the Sign In button at the top of this page. It takes you to the platform.
Our order process is conducted by our online reseller Paddle.com, which is the Merchant of Record for all orders. Paddle handles payment, applicable taxes, receipts and customer support for billing. Your receipt links to the Terms of Service and Refund Policy.
Yes. Both the monthly and annual plans can be cancelled anytime. See our Refund Policy for details.